Skip to content
Lyteworkgo Help

Job profit and expenses

See what a job made — revenue next to materials, labor and expenses — compare jobs in the Job profit report, record job expenses with their receipts, and set what an hour of each person's time costs.

The Profit tab on a job shows what the job earned next to what it cost, so you can see which work actually pays. It adds up the materials, the time logged on the job at each person’s labor rate, and the job’s expenses, and shows the gross profit and margin.

Who sees it. Costs are private business numbers, so the Profit tab, expenses and labor rates appear only for people who can See costs: owners and admins always, and Billing by default. Field techs and Office staff don't see them unless it is switched on for them. Setting labor rates also needs managing users (each person's rate, in Edit user on the Users page) or settings (the default rate, in System Settings) — owners and admins. See Customizing access.

The Profit tab

Open a job and choose the Profit tab, next to Details. It lists:

Below the totals, Labor by person shows each person’s hours and what their time cost.

A draft job has no Profit tab. Save it first. While you’re editing a job, the Profit tab is unavailable; save or cancel your changes to open it.

Estimated, then actual

Revenue is marked Estimated or Actual, and the sentence under it says which and why:

A deposit on its own doesn’t make the job invoiced, and neither does the invoice a change order billed right away: the job stays estimated until the job itself is billed. The deposit is part of the work, and the change order is already in the job’s line items. Once the job’s own invoice exists, both count beside it.

If you can see costs but not invoices, revenue is always the estimate from the job’s line items, and the tab says Invoice details aren’t visible to your role. It doesn’t show any invoices.

Revenue sources

Under the revenue, Revenue sources lists where the number comes from, before tax, and whether each one counts:

Tap a quote or invoice number to open it, or a change-order line to go to the job’s Change orders. You see invoices only if you can see invoices. A Field tech who sees only their own work sees an invoice they can’t open (the office’s deposit, say) without its number when it counts, and doesn’t see it when it doesn’t.

Time without a rate

If some of the time on the job was logged by someone with no labor rate, and there is no default rate, that time isn’t counted in the labor cost. The card warns you, and the person is marked No rate under Labor by person. The profit shown is then higher than it really is. The same goes for a material with no cost: it’s left out, and the Materials line says how many.

Expenses

Expenses are money spent on a job that isn’t a material or someone’s time: equipment rental, a subcontractor, a permit, disposal, fuel or other.

To add one, tap Add expense under Expenses on the Profit tab. Enter the date, the amount and the category, and add a note if you like. You can also attach the receipt — a photo or a PDF. Tap Add expense to save it.

A subcontractor’s bill is an expense in the Subcontractor category. Subcontractors you share a job with through a link don’t log time, so their cost never shows under labor. See Share a job with a subcontractor.

Adding expenses needs permission to edit jobs as well as See costs.

Labor cost rates

A labor cost rate is what an hour of someone’s time costs your business — their wage plus what you pay on top of it. There are two:

A rate applies to time logged from then on. When someone logs time, the job keeps the rate that applied at that moment. Changing a rate later — or correcting the hours on an entry — doesn’t change the cost of time already logged, so past jobs keep their real numbers. Time logged while there was no rate stays without one; to price it, delete the entry and log it again.

The Job profit report

To compare jobs side by side, open Reports and choose the Job profit tab. It lists every job completed in the dates you pick, each with its revenue, materials, labor, expenses, gross profit and margin — the same numbers as the job’s Profit tab. The cards at the top add them up for the whole period.

If more than 1,000 jobs were completed in the dates you picked, the report shows the 1,000 most recent and says so. Pick fewer dates or a filter to see the rest.

Who sees it. People who can see both reports and costs: owners, admins, and Billing (unless See costs is switched off for them). Office staff see it only when both See reports and See costs are switched on for them. Field techs don't see Reports.